What the plan is for
An advocacy plan is a council’s list of the things it wants other governments to pay
for or decide. The staff report that put this one to the
20 October
meeting (item 13.1) says it has been prepared to inform the upcoming State and Federal Government election
,
and that it builds on a State Government Advocacy Plan the council endorsed in
August 2025. The exhibition page says the plan does not commit the council to delivering any of
the projects. The
mayor, Cameron McDonald, frames it in the foreword:
Where a decision sits with another level of government, we will make the case clearly while providing the evidence and working constructively for the best outcome for the Kiama community.
The 11 priorities, and what each asks for
The plan groups them under four headings. Each gets a page with the issue, the request and a funding status. A
- Spring Creek (housing). Replace a restrictive covenant on the council’s
Spring Creek land so it can be planned for housing. The plan says the covenant
prevents urban development while Bombo Quarry remains operational
. - Shoalhaven Street Precinct (housing). State help to pay for decontaminating the Kiama Depot site, rezoned from industrial to residential, and a partnership on affordable housing there.
- Bombo Water Resource Recovery Facility. NSW Government and Sydney Water
investment in wastewater capacity. The plan says the plant is nearing capacity, with more
overflow incidents and odour, and that
A total of 600 connections is not enough to meet housing targets
. - Jamberoo Mountain Road. Make it a NSW Government-managed road. The plan
says
There are 900 car movements per day and 14% are from heavy vehicles, which are banned.
It is the second road Kiama wants the state to take over: on 20 October it also backed a joint bid with Shoalhaven for the Gerroa road. - Education and early learning. A funded state childcare strategy for the Kiama Urban Expansion Area, which the plan says could take up to 4,500 new lots, and help to redevelop or move the flood-affected Jamberoo Community Preschool.
- Spring Creek flooding. State funding for flood works and the flood study’s
recommendations; funding status
Nil
. - Growth area transport. A funded state partnership on roads, water and other enabling works, including money for a Strategic Active Transport Plan.
- Blowhole Point Precinct. A lease over the Cargo’s Wharf restaurant
site assigned to the council, and Transport for NSW to act on the Kiama Harbour
Revitalisation Plan. The request box names the
Federal Government
as the one to assign the lease; the text beside it names Crown Lands, a state agency. - Kiama Sporting Future. Federal and state money for a staged rebuild of the
sports precinct and leisure centre. The plan says the masterplan is done and the council
still requires a mixture of funding
. - Contemporary CCTV. State funding to replace a public camera network the plan says severe weather has damaged, and a 24-hour, seven-day local police presence.
- Connecting coast and town. State funding for a cycleway and pedestrian strategy, to line up projects such as Kiama Coast Walk Stage 2.
Three “live requests” sit outside the 11: changes to how council finances are measured, letting a council shrink its numbers for the rest of a term instead of holding a by-election when a seat falls vacant, and Sydney Water taking over a legacy watermain on Jerrara Road.
Exhibit A · from the source
Spring Creek (Housing). Funding Status: No direct funding.
Shoalhaven Street Precinct (Housing). Funding Status: No direct funding.
Bombo Water Resource Recovery Facility (Infrastructure). Funding Status: TBC.
Jamberoo Mountain Road (Infrastructure). Funding Status: TBC.
Education and Early Learning (Infrastructure). Funding Status: TBC.
Spring Creek Flooding (Infrastructure). Funding Status: Nil.
Growth Area Transport (Infrastructure). Funding Status: Project funding TBC.
Blowhole Point Precinct (Liveability). Funding Status: TBC.
Kiama Sporting Future (Liveability). Funding Status: TBC.
Contemporary CCTV Infrastructure (Liveability). Funding Status: TBC.
Connecting Coast and Town (Connections). Funding Status: TBC.
Blue Haven, added late and without the line about cost
The draft does not mention Blue Haven Terralong, the council’s retirement village,
for which the Performance Improvement Order
the council works under requires a business case. At the 20 October meeting, Councillor Larkins moved, seconded by Councillor Warren, that the
plan be updated after exhibition to add four things: public EV charging, the NSW Public
Libraries Association’s advocacy, flood and coastal erosion funding, and state and
federal help with critical maintenance and renewal at Blue Haven. As moved, the Blue Haven
item ended by noting that the quantum of costs required is far beyond what Council and ratepayers can fund alone
.
B
Exhibit B · from the source
The minutes record that At the request of Councillor Brown and by consent the motion was amended
.
The version carried as resolution 26/276OC, 9-0, keeps all four additions but stops at
critical maintenance and renewal works at Blue Haven Terralong.
The words about cost are gone. The minutes do not record a reason.
What happens next
Submissions close on Monday 23 November, through the Your Say page or by email or post quoting reference SC5391. Under the resolution, the plan comes back to council with a report if there are submissions or substantial changes, and is adopted without one if there are neither. The exhibition page says the four additions will be made after exhibition, alongside any feedback. The plan says an online hub will then track each priority’s status. When the plan comes back to council or is adopted, we will report which, and whether any priority has gained a cost.
Our read
This is opinion, built on the documents above.
A wish list without prices is easy to agree with and easy to ignore. The
council says it will make its case while providing the evidence
,
and some of its evidence is pointed: a sewage plant it says is near capacity, a mountain road it
says carries banned heavy vehicles, a camera network it says severe weather damaged. But a minister or a
candidate deciding what to promise needs to know roughly what an ask costs, and not one of
the 11 pages says. Where the council has an estimate, the final
plan should print it; where it has none, it should say so and say when it will.
Blue Haven is the clearest case. It is the one item councillors described, in the motion as moved, as costing far more than the council and its ratepayers can fund, and it is the one item not in the draft residents are being asked to comment on. Residents being consulted on a proposed special rate variation are entitled to see Blue Haven’s ask written out, with a figure, before the plan is adopted.
How we sourced this
We read all 24 pages of the draft plan as published on Kiama’s Your Say site. It is a scanned print with no text layer, so we read it as page images and transcribed the passages we quote and count; that transcription is ours, and we checked each quoted line against the page. We read the exhibition page, the staff report on item 13.1 in the 20 October 2026 agenda (pages 43 to 45) and the motion, amendment and resolution 26/276OC in the minutes (pages 7 and 8). “Prices none” means no priority page states a cost estimate or a dollar amount sought; the only dollar figure in the plan is the LG8 region’s combined gross regional product. We have not contacted the council, and we have not seen the 2025 State Government Advocacy Plan the draft builds on. The section headed Our read is opinion.
Sources
How we did it. AI did the heavy reading and the first draft; people own what it says. Built from the primary sources below. 23 quotations were machine-checked, character by character, against our archived copies. Read our method.
- Kiama Municipal Council, DRAFT Advocating for Kiama 2026-28 (PDF, 24 pages), created 15 October 2026, read 11 November 2026: the mayoral message (p4), the 11 priorities (p6 and pp 9 to 19), live requests (p20), the online hub (p22). Shown in Exhibit A.
- Kiama Municipal Council, Your Say: Advocacy Plan, read 11 November 2026: exhibition 26 October to 23 November 2026, reference SC5391, and the four additions the plan will take after exhibition.
- Kiama Municipal Council, Ordinary meeting 20 October 2026, agenda, item 13.1, Endorse for public exhibition: Draft Advocating for Kiama Plan 2026-28 (pages 43 to 45).
- Kiama Municipal Council, Minutes of the ordinary meeting, 20 October 2026, item 13.1: the motion as moved (page 7), the amendment and resolution 26/276OC with its vote (page 8). Shown in Exhibit B.
Spotted an error, or read these documents differently? Tell us and we will check it against the documents and log the outcome here.