What was decided
Wollongong City Council’s Development Control Plan (DCP) is its rulebook for how
development is designed. Chapter D16 covers the West Dapto Urban Release Area, which the
council’s August report describes as about 4,700 hectares, planned for 56,500 people
in an additional 19,500 dwellings, and
the last remaining area for large scale urban development in the Wollongong Local Government Area
(24 August 2026 business paper, item 3,
page 122).
A revised chapter was exhibited from 3 September to 12 October 2026 and drew eight submissions. On 16 November the council adopted it (minute 117) with a notice to go on its website. The minutes (page 3) record the vote as 10 to 3: Councillors Hayes, R Martin, Quinn, D Brown, Haden, A Martin, Campbell, Anthony, Morris and the Lord Mayor, Councillor T Brown, in favour; Councillors Whittaker, Docker and Stuart against. One speaker addressed the item in the public access forum, against the recommendation.
Before that vote, an amendment moved by Councillor Stuart and seconded by Councillor Docker
lost 4 to 9. It would have changed the chapter’s first conservation principle (section
8.1.1), which asks planners to avoid impacts on threatened ecological communities or stands of
habitat greater than 4ha
,
so that the threshold read
equal to or greater than 0.75 ha
.
The 4 hectare threshold is unchanged from the chapter in force since 23 June 2025.
The flood standard that was exhibited
Some roads in West Dapto are designated “flood reliable” and shown on the
chapter’s Figure 7. They are the roads that have to stay open in a flood. The
council’s November report says why:
Designated roads need to remain trafficable in the flood event to ensure that residents can evacuate, and emergency vehicles can respond to incidents.
(page 605).
The exhibited draft would have set a precise standard for them. It said
designated roads will need to have the road surface remain dry from mainstream flooding
in the 1% Annual Exceedance Probability (AEP) flood, the flood with a one in 100 chance of
happening in any year (page 140), and wrote the standard as a formula (page 141), with rainfall
increased for climate change on a high-emissions scenario
based on a 2090-time horizon
.
A
Exhibit A · from the source
The draft defines the blockage envelope as
Enveloped blocked and unblocked scenarios
,
that is, the worse of the two; freeboard is a safety margin above the modelled flood level.
The chapter in force since 23 June 2025 says in its transport section that Figure 7 roads will
provide 1% AEP flood immunity (page 11), and its water management objective (section 7.5.1 f,
page 22) reads:
Design specific roads within the urban release area to achieve a 1% AEP flood event immunity including a pre-determined climate change factor or greater flood event.
Why it was pulled
The 16 November report
(item 5, page 604) says the in-force rules already carry
implicit climate change and blockage factor requirements
,
and that the exhibited version added freeboard and defined the terms. In an initial comparison with
controls used by Liverpool, Blacktown, Campbelltown and Lake Macquarie councils, staff found
the current West Dapto provisions
comparable to other Local Government Area controls for release areas in NSW
.
They concluded that any change
warrant additional work to further understand feasibility and infrastructure funding implications, impact on community and the safety implications
.
B
Exhibit B · from the source
So the exhibited references
have been removed from the revised draft DCP Chapter D16 (Attachment 2), and the current in force wording has been reinstated
,
with any change to come in
a future Council report
.
The report gives no date for it. Its risk section says staff will look at the
financial, operational, legal, governance and reputational consequences
for the council of adopting the exhibited standard (page 605), and its financial section notes
that
The majority of flood reliable roads will be delivered through development contributions
,
paid by developers, with a smaller number built by developers directly (page 606).
The report says staff reviewed submissions’ feedback. The summary of the eight submissions attached to it (pages 607 to 615) does not record one about the standard for flood reliable roads; two raise flood planning for housing land. The report does not say which feedback prompted the change.
What the adopted chapter now says
In the adopted text (Attachment 2), the transport section’s sentence is back to the in-force wording, printed in red as reinstated: Figure 7 roads will provide 1% AEP flood immunity (page 632). The formula, the 2090 rainfall and the 0.3 metre freeboard are gone.
The water management section was not changed back. Its objective for these roads (section 7.5.1 f, page 644) carries the exhibited wording, not the in-force wording quoted above. C
Exhibit C · from the source
The control that developments must meet (section 7.11 m, page 650) changed the same way.
In force since June 2025 it reads
Developments shall be demonstrated to have reliable access in a 1% AEP event
to the designated roads (page 27). As adopted it reads
Developments shall demonstrate flood reliable access in a 1% AEP event based on a blockage envelope plus a climate change factor plus freeboard
.
The outcomes list in between (section 7.5.2, page 645) also adds blockage and freeboard. None
of the three says how much freeboard, and with section 6’s definitions removed, the
chapter does not say anywhere how much freeboard a flood reliable road needs. It does give
500 millimetres for raising residential land and for clearance under bridges.
Our read
This is opinion, built on the documents above.
Costing a stricter standard before imposing it is reasonable. Most of these roads are funded through development contributions, the exhibited version would have raised the bar for all of them, and the council’s own comparison found the existing rules in line with other big NSW release areas. A standard drafted against 2090 rainfall deserves a proper look at what it costs and where it bites before it binds. We do not fault the decision to pause it.
But the adopted chapter now says two things. The report says freeboard was the new requirement, and that the exhibited references were removed and the in-force wording reinstated. Section 6 bears that out. Section 7.5.1 f and section 7.11 m do not: they still ask designated roads, and the access every development must show to them, to meet the flood plus blockage, a climate change factor and freeboard, and the chapter no longer says how much freeboard that is. Either the water management clauses were meant to revert too, or the council intends part of the tougher standard to apply now. Someone designing a subdivision road, or assessing one, could fairly read it either way. Only the council can say which it means, and it should fix the text so the chapter says it once.
The promised report needs a date. West Dapto is being built now, and a road built to one standard stays at that level for decades. “A future Council report” with no timetable leaves the question of how dry the escape roads must be open while they are laid. We asked Wollongong City Council on 25 November 2026 which standard now applies to the designated roads, what freeboard section 7.5.1 f and section 7.11 m mean, and when the further report is expected, and will add its answer here, or say if none arrives. When that report comes to council, we will report what it proposes.
How we sourced this
We read item 5 of the 16 November 2026 business paper in full (report, printed pages 602 to 606, and the submissions summary, pages 607 to 615), the adopted chapter in Attachment 2 at the clauses cited (pages 632, 644, 645, 650 and 651), and the minutes of that meeting (pages 2 and 3). We compared them with the exhibited draft in item 3 of the 24 August 2026 business paper (pages 122, 140 and 141 and the matching water management clauses) and with the chapter now linked from the council’s Development Control Plan page, marked In Force 23/06/2025 (pages 11, 22, 27 and 28). We searched each version for freeboard, blockage and flood immunity. On 25 November 2026 the council’s Development Control Plan page still linked the June 2025 chapter, and its public notices page listed no adoption notice. Page numbers are the documents’ own printed numbers. The vote counts are the minutes’ named lists. We asked Wollongong City Council on 25 November 2026 which flood standard applies. The section headed Our read is opinion.
Sources
How we did it. AI did the heavy reading and the first draft; people own what it says. Built from the primary sources below. 17 quotations were machine-checked, character by character, against our archived copies. Read our method.
- Wollongong City Council, Ordinary Meeting 16 November 2026, item 5, Post Exhibition: Wollongong Development Control Plan 2009, Chapter D16, West Dapto Release Area, with Attachment 1 (summary of submissions) and Attachment 2 (the chapter as adopted), read 25 November 2026 (pages 602 to 615, 632, 644, 645, 650 and 651). Shown in Exhibits B and C.
- Wollongong City Council, Minutes, Ordinary Meeting of Council, 16 November 2026, read 25 November 2026: minute 117 and the lost amendment (page 3), the public access forum (page 1).
- Wollongong City Council, Ordinary Meeting 24 August 2026, item 3, Public Exhibition: draft Chapter D16, West Dapto Urban Release Area, read 25 November 2026 (pages 122, 140 and 141). Shown in Exhibit A.
- Wollongong City Council, Minutes, Ordinary Meeting of Council, 24 August 2026, read 25 November 2026: minute 80, the resolution to exhibit.
- Wollongong City Council, Wollongong DCP 2009 Chapter D16, West Dapto Release Area, marked In Force 23/06/2025, linked from the council’s Development Control Plan page, both read 25 November 2026 (pages 11, 22, 27 and 28).
- Wollongong City Council, Public Notices, read 25 November 2026.
Spotted an error, or read these documents differently? Tell us and we will check it against the documents and log the outcome here.